Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start [04 Jul 2021 14:37] cookie Rhino Right Hand Route Rebolted |
start [08 Nov 2022 11:43] peteh add newsletter |
||
---|---|---|---|
Line 7: | Line 7: | ||
metatag-keywords=(caves, | metatag-keywords=(caves, | ||
metatag-og: | metatag-og: | ||
- | metatag-media-og: | + | metatag-media-og: |
metatag-og: | metatag-og: | ||
}} | }} | ||
Line 15: | Line 15: | ||
<col xs=" | <col xs=" | ||
- | <panel type=" | + | <panel type=" |
+ | [[news: | ||
+ | The latest issue of the CSCC Newsletter is now available to read online. | ||
- | From Charterhouse Caving Company Ltd | + | < |
- | After a long day’s work last weekend, the Right-Hand Route in Rhino Rift has been rebolted using BCA approved IC resin anchors. | ||
- | |||
- | The resin holding the new bolts has now had time to cure and so the route is usable again from this weekend (26th June) ... | ||
- | |||
- | < | ||
- | |||
- | 25th June 2021 | ||
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="warning" title=" | + | <panel type="primary" title=" |
- | {{ :news:thrupe_lane_entrance.jpg?nolink&100|}} | + | [[news: |
- | Following requests from concerned locals, a CSCC padlock will be fitted to the entrance gate of Thrupe Lane Swallet. | + | 5th October 2022 |
- | + | ||
- | < | + | |
- | + | ||
- | 9th June 2021 | + | |
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type=" | + | <panel type=" |
- | {{ :news:mcr_logo.png? | + | {{ :news:2022.06.01_compton_martin_ochre_mine.jpg? |
- | From Mendip Cave Rescue | + | The gate at Compton martin Ochre Mine has needed replacement for some time, after the old gate rusted away. |
- | MCR has had to restructure itself and has reconstituted itself as a registered charity. With the new structure cavers who wish to continue supporting the MCR by being on the cavers call out list are invited to apply for associate membership ... | + | This has now been completed, so please remember |
- | < | + | < |
- | 26th May 2021 | + | 1st June 2022 |
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type=" | + | <panel type=" |
+ | {{ : | ||
+ | Following the email yesterday regarding reports of loose rock in Rhino Rift, Andrew Atkinson, CSCC’s Equipment & Techniques Officer, supported by Sioned Haughton, visited the cave at the request of CCC Ltd on the evening of Monday 17th January. | ||
- | From Charterhouse Caving Company Ltd | + | Following the remedial work undertaken, the cave is open for trips. |
- | ROCKFALL IN THE AREA OF THE WATERFALL CLIMB, GB CAVERN | + | < |
- | Following the rockfall notified and publicised in early February, a further inspection trip was scheduled for 6 April, following the relaxation of covid restrictions. On 5th April, a report was received of a further fall. The inspection trip comprised Linda Wilson (Conservation Officer), Dave King and Graham Price (CCC Directors). A large area of the side of the passage above the big steps on the left hand side (when travelling into the cave, heading downstream) has come away, resulting in a massive, unstable talus cone of boulders, large rocks, smaller shattered rocks and mud that now completely covers the steps almost to the base of the ledge in the middle of the climb. Boulders and large rocks are spread over a wide area in the passage below the climb ... | + | 18th January 2022 |
- | + | ||
- | < | + | |
- | + | ||
- | 7th Apr 2021 | + | |
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="primary" title=" | + | <panel type="warning" title=" |
- | {{ :logo-2021.png? | + | {{ :news: |
- | Dear Southern Cavers, | + | Following a change in ownership and landscaping work, the entrance to Singing River Mine is now located in a private garden. |
- | It is with some relief that as from Monday 29th March that the national “stay at home” rule will end, and the long path to a return to something like normality can begin. This means that it is no longer illegal to leave home without a valid excuse, though the government asks that we all minimise the number of journeys we make. From Monday 29th it is also permitted | + | Arrangements |
- | < | + | **In the meantime all visits should be avoided.** |
- | 28th Mar 2021 | + | < |
+ | |||
+ | 8th July 2021 | ||
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="primary" title=" | + | <panel type="warning" title=" |
- | {{ :bca-logo-mini-white.png? | + | {{ :news: |
- | Following the Government announcement for England in its Covid-19 Response Spring 2021 – the Roadmap out of Lockdown, BCA offers the following synopsis about how this may affect caving ... | + | |
- | See the [[https:// | + | Following requests from concerned locals, a CSCC padlock will be fitted to the entrance gate of Thrupe Lane Swallet. |
- | 29th March 2021 | + | < |
+ | |||
+ | 9th June 2021 | ||
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type=" | + | <panel type=" |
+ | {{ : | ||
+ | From Mendip Cave Rescue | ||
- | BCRC have issued | + | MCR has had to restructure itself and has reconstituted itself as a registered charity. With the new structure cavers who wish to continue supporting the MCR by being on the cavers call out list are invited |
- | See the [[https:// | + | <btn>[[news:2021_05_26_invitation_to_join_mcr|Read more ...]]</ |
- | 27th June 2020 | + | 26th May 2021 |
</ | </ | ||
</ | </ | ||
Line 117: | Line 111: | ||
<col xs=" | <col xs=" | ||
<panel type=" | <panel type=" | ||
- | {{ : | + | [[https:// |
{{rss> | {{rss> | ||
+ | </ | ||
+ | </ | ||
+ | |||
+ | <col xs=" | ||
+ | <panel type=" | ||
+ | [[https:// | ||
+ | **Any weather warnings for southern England in the next seven days are listed here:** | ||
+ | |||
+ | {{rss> | ||
+ | {{rss> | ||
</ | </ | ||
</ | </ |