Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start [08 Mar 2021 18:56] cookie [Welcome] Shortened news items with link to full article |
start [01 Jun 2021 00:51] cookie Invitation to Join Mendip Cave Rescue |
||
---|---|---|---|
Line 14: | Line 14: | ||
< | < | ||
<col xs=" | <col xs=" | ||
- | <panel type=" | + | <panel type=" |
- | Dear Southern Cavers, | + | {{ : |
+ | From Mendip Cave Rescue | ||
- | Well it looks like there may be light at the end of the lockdown tunnel as the vaccination programme proceeds at pace and warmer weather is on the way. I know we have all been frustrated with most of us stranded above ground for the best part of a year, but I am sure we can look forward | + | MCR has had to restructure itself |
- | 24 Feb 2021 | + | < |
- | < | + | 26th May 2021 |
</ | </ | ||
- | </ | ||
- | <col xs=" | + | <panel type="warning" title=" |
- | <panel type="danger" title=" | + | |
From Charterhouse Caving Company Ltd | From Charterhouse Caving Company Ltd | ||
- | "The site of the reported rockfall in GB near the waterfall climb in Main Chamber has been checked. There has been a recent fall of mud, gravel and smallish boulders on the left (when viewed facing downstream) of the waterfall climb, near the bottom. The wall above the last part of the climb (the big steps) appears as it did before, but should be considered loose due to the recent fall. | + | At some point during |
- | 8 Feb 2021 | + | This became known at the recent CSCC AGM and the route was inspected on Tuesday 18th May. Unfortunately, |
- | < | + | < |
+ | |||
+ | 19th May 2021 | ||
</ | </ | ||
- | </ | ||
- | <col xs=" | + | <panel type="warning" title=" |
- | <panel type="danger" title=" | + | |
- | Dear Southern Cavers, | + | |
- | As all of you are now no doubt aware the UK is now in the throws of the third national lockdown | + | From Charterhouse Caving Company Ltd |
+ | |||
+ | The vandalised lock on Longwood Swallet has now been replaced and access to the cave has been restored. | ||
+ | |||
+ | Graham Mullan\\ | ||
+ | Secretary\\ | ||
+ | Charterhouse Caving Company Ltd\\ | ||
+ | 27th Apr 2021 | ||
+ | </ | ||
+ | |||
+ | <panel type=" | ||
+ | |||
+ | From Charterhouse Caving Company Ltd | ||
+ | |||
+ | ROCKFALL IN THE AREA OF THE WATERFALL CLIMB, GB CAVERN | ||
+ | |||
+ | Following | ||
- | 9 Jan 2021 | + | < |
- | < | + | 7th Apr 2021 |
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="danger" title=" | + | <panel type="primary" title=" |
+ | {{ : | ||
Dear Southern Cavers, | Dear Southern Cavers, | ||
- | As most all of you will be aware, the government announced on Saturday | + | It is with some relief that as from Monday 29th March that the national “stay at home” rule will end, and the long path to a return to something like normality can begin. This means that it is no longer illegal |
- | 2 Nov 2020 | + | < |
- | < | + | 28th Mar 2021 |
</ | </ | ||
- | |||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="danger" title=" | + | <panel type="primary" title=" |
+ | {{ : | ||
+ | Following the Government announcement for England in its Covid-19 Response Spring 2021 – the Roadmap out of Lockdown, BCA offers the following synopsis about how this may affect caving ... | ||
- | BCA have issued a series of useful updates on the coronavirus and how it related to caving. | + | See the [[https:// |
+ | 29th March 2021 | ||
</ | </ | ||
</ | </ | ||
<col xs=" | <col xs=" | ||
- | <panel type="danger" title=" | + | <panel type="primary" title=" |
+ | |||
+ | BCRC have issued a press release on the coronavirus giving guidance should a return to underground activity become available ... | ||
- | BCRC have issued a press release on the coronavirus giving guidance should a return to underground activity become available. | + | See the [[https:// |
+ | 27th June 2020 | ||
</ | </ | ||
</ | </ | ||
Line 81: | Line 101: | ||
<col xs=" | <col xs=" | ||
<panel type=" | <panel type=" | ||
+ | {{ : | ||
Further to the decision by Longleat to close the show caves and suspend their operations in Cheddar, they have notified CSCC that with immediate effect caver access to all caves on Longleat property which includes the whole south side of the Gorge, is no longer available. This includes all caves and digs, and affects sites such as Reservoir Hole, Spider Hole, Goughs Cave, Long Hole, Great Oones etc. | Further to the decision by Longleat to close the show caves and suspend their operations in Cheddar, they have notified CSCC that with immediate effect caver access to all caves on Longleat property which includes the whole south side of the Gorge, is no longer available. This includes all caves and digs, and affects sites such as Reservoir Hole, Spider Hole, Goughs Cave, Long Hole, Great Oones etc. | ||