Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
equipment:cscc_anchor_placement_programme [04 May 2021 08:12]
andrew Added list of anchor requests
equipment:cscc_anchor_placement_programme [11 May 2022 09:02]
andrew [CSCC Anchor Placement Programme] Eastwater approved
Line 4: Line 4:
  
 The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time. The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
-^Date  ^Cave^Description^Outcome+^Date  ^Cave^Description^Status^ 
-|April 2020  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Pending|+ 
 +|October 2021  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Awaiting install| 
 +|June 2021  |Rhino  |[[equipment:Rhino]], Right Hand Route, replace spits|Approved,  installed| 
 +|April 2021  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 ==== Documentation ==== ==== Documentation ====
  
  • Last modified: 14 May 2022 07:27
  • by andrew