Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
equipment:cscc_anchor_placement_programme [04 Nov 2012 16:20]
cookie created
equipment:cscc_anchor_placement_programme [11 May 2022 09:02]
andrew [CSCC Anchor Placement Programme] Eastwater approved
Line 1: Line 1:
 +====== CSCC Anchor Placement Programme ======
 +\\
 +To request that CSCC consider placing anchors in a place where there are currently none, or that may benefit for additional anchors, please bring it to a CSCC meeting by filling in the anchor request form below.
 +
 +The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
 +^Date  ^Cave^Description^Status^
 +
 +|October 2021  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Awaiting install|
 +|June 2021  |Rhino  |[[equipment:Rhino]], Right Hand Route, replace spits|Approved,  installed|
 +|April 2021  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 +==== Documentation ====
 +
 These documents describe the CSCC's Anchor Placement Programme. These documents describe the CSCC's Anchor Placement Programme.
  
Line 5: Line 17:
 {{:equipment:cscc-eq-pr-1001_rev_2_anchor_management_procedure.pdf|Anchor Management Procedure}} {{:equipment:cscc-eq-pr-1001_rev_2_anchor_management_procedure.pdf|Anchor Management Procedure}}
  
-{{:equipment:cscc-eq-gn-1002_rev_2_anchor_inspection_usage.pdf|Anchor Inspection & Usage}}[root@server equipment]#+{{:equipment:cscc-eq-gn-1002_rev_2_anchor_inspection_usage.pdf|Anchor Inspection & Usage}}
  • Last modified: 14 May 2022 07:27
  • by andrew