Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start [09 Jun 2021 09:17]
peteh [Edit - Panel] add thrupe lane panel
start [08 Jul 2021 10:21]
cookie [Thrupe Lane Swallet] Titled photo
Line 13: Line 13:
  
 <grid> <grid>
 +
 <col xs="12" sm="6" md="4" lg="4"> <col xs="12" sm="6" md="4" lg="4">
-<panel type="primary" title="Thrupe Lane Swallet to receive CSCC Padlock"> +<panel type="warning" title="Singing River Mine Access"> 
-{{ :news:thrupe_lane_entrance.jpg?nolink&100|}}+{{ :news:singing_river_mine_entrance.jpg?nolink&100|Singing River Mine by Paul Stillman}}
  
-Following requests from concerned locals, CSCC padlock will be fitted to the entrance gate of Thrupe Lane Swallet.+Following a change in ownership and landscaping work, the entrance to Singing River Mine is now located in a private garden.
  
-<btn>[[news:2021_06_09_thrup_lane_cscc_lock|Read more ...]]</btn>+Arrangements for future access are under discussion and will be available as soon as possible.
  
-9th June 2021+**In the meantime all visits should be avoided.** 
 + 
 +<btn>[[news:2020_07_08_singing_river_mine_access|Read more ...]]</btn> 
 + 
 +8th July 2021
 </panel> </panel>
 +</col>
  
-<panel type="primary" title="MCRInvitation to Join Mendip Cave Rescue"> +<col xs="12" sm="6" md="4" lg="4"> 
-{{ :news:mcr_logo.png?nolink&100|}} +<panel type="primary" title="CCC LtdRhino Right Hand Route Rebolted">
-From Mendip Cave Rescue+
  
-MCR has had to restructure itself and has reconstituted itself as a registered charity. With the new structure cavers who wish to continue supporting the MCR by being on the cavers call out list are invited to apply for associate membership ...+From Charterhouse Caving Company Ltd
  
-<btn>[[news:2021_05_26_invitation_to_join_mcr|Read more ...]]</btn>+After a long day’s work last weekend, the Right-Hand Route in Rhino Rift has been rebolted using BCA approved IC resin anchors.
  
-26th May 2021 +The resin holding the new bolts has now had time to cure and so the route is usable again from this weekend (26th June) ...
-</panel>+
  
-<panel type="warning" title="CCC LtdUnauthorised Bolting of Rhino Right Hand Route">+<btn>[[news:2021_06_25_rhino_right_hand_route_rebolted|Read more ...]]</btn>
  
-From Charterhouse Caving Company Ltd+25th June 2021 
 +</panel> 
 +</col>
  
-At some point during the past six months, persons unknown have made an unauthorised attempt to rebolt the Rhino Rift Right-Hand Route+<col xs="12" sm="6" md="4" lg="4"> 
 +<panel type="warning" title="Thrupe Lane Swallet to receive CSCC Padlock"> 
 +{{ :news:thrupe_lane_entrance.jpg?nolink&100|Thrupe Lane Swallet poss. by Dave King}}
  
-This became known at the recent CSCC AGM and the route was inspected on Tuesday 18th May. Unfortunately, the work has been poorly executed using various types of expansion bolts. Some of these have not set properly and rotate within their holes. Some have been placed too close to the pre-existing spits, compromising the strength and safety of both the new and the original anchors. Where possible, all the nuts and hangers have been removed, although some could not be removed from some very poorly set bolts. Nothing could be done immediately about the dangerously placed ones and so this route should not be used until it can be fully rebolted by an approved installer using resin anchors ...+Following requests from concerned locals, a CSCC padlock will be fitted to the entrance gate of Thrupe Lane Swallet.
  
-<btn>[[news:2021_05_19_rhino_unauthorised_bolting|Read more ...]]</btn>+<btn>[[news:2021_06_09_thrup_lane_cscc_lock|Read more ...]]</btn>
  
-19th May 2021+9th June 2021
 </panel> </panel>
 +</col>
  
-<panel type="warning" title="CCC LtdLongwood Swallet Lock">+<col xs="12" sm="6" md="4" lg="4"> 
 +<panel type="primary" title="MCRInvitation to Join Mendip Cave Rescue"> 
 +{{ :news:mcr_logo.png?nolink&100|}} 
 +From Mendip Cave Rescue
  
-From Charterhouse Caving Company Ltd+MCR has had to restructure itself and has reconstituted itself as a registered charity. With the new structure cavers who wish to continue supporting the MCR by being on the cavers call out list are invited to apply for associate membership ...
  
-The vandalised lock on Longwood Swallet has now been replaced and access to the cave has been restored.+<btn>[[news:2021_05_26_invitation_to_join_mcr|Read more ...]]</btn>
  
-Graham Mullan\\ +26th May 2021
-Secretary\\ +
-Charterhouse Caving Company Ltd\\ +
-27th Apr 2021+
 </panel> </panel>
 +</col>
  
 +<col xs="12" sm="6" md="4" lg="4">
 <panel type="danger" title="CCC Ltd: WARNING - Rockfall in G.B. Cave - Update"> <panel type="danger" title="CCC Ltd: WARNING - Rockfall in G.B. Cave - Update">
  
Line 112: Line 123:
 <panel type="primary" title="Access to caves in Cheddar Gorge"> <panel type="primary" title="Access to caves in Cheddar Gorge">
 {{ :news:cheddar_caves_logo.jpg?nolink&150|Cheddar Caves Logo}} {{ :news:cheddar_caves_logo.jpg?nolink&150|Cheddar Caves Logo}}
-Further to the decision by Longleat to close the show caves and suspend their operations in Cheddar, they have notified CSCC that with immediate effect caver access to all caves on Longleat property which includes the whole south side of the Gorge, is no longer available. This includes all caves and digs, and affects sites such as Reservoir Hole, Spider Hole, Goughs Cave, Long Hole, Great Oones etc.+Further to the decision by Longleat to close the show caves and suspend their operations in Cheddar, they have notified CSCC that with immediate effect caver access to all caves on Longleat property which includes the whole south side of the Gorge, is no longer available. This includes all caves and digs, and affects sites such as Reservoir Hole, Spider Hole, Goughs Cave, Long Hole, Great Oones etc ...
  
-Longleat are not adverse to reinstating caver access subject to an access agreement with CSCCNegotiations to formalise an access procedure were started at the request of Longleat a few years ago but were never concluded.+<btn>[[news:2020_10_11_access_to_caves_in_cheddar_gorge|Read more ...]]</btn>
  
-Discussions have recommenced and both parties are hopeful of a favourable and positive outcome, however in the meantime all the caves are closed. 
- 
-Longleat will be keeping a presence in the Gorge for maintenance purposes, but this is all. Approaches should not be made to Longleat or any of their representatives as permission to visit any of the caves will be denied. 
- 
-[[canda@cscc.org.uk|Graham Price]]\\ 
-Conservation & Access Officer\\ 
 11th Oct 2020 11th Oct 2020
 </panel> </panel>
 </col> </col>
  
- +<col xs="12" sm="6" md="4" lg="4"> 
 +<panel type="info" title="BCA News Feed"> 
 +{{ :bca-logo-mini-white.png?nolink&100|}} 
 +{{rss>https://british-caving.org.uk/news/?feed=rss2 8 date }} 
 +</panel> 
 +</col>
  
 </grid> </grid>
  
  
  • Last modified: 07 Mar 2024 00:54
  • by cookie