Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
equipment:cscc_anchor_placement_programme [12 Nov 2021 17:46]
andrew [CSCC Anchor Placement Programme] Added Eastwater, 35ft pitch proposal
equipment:cscc_anchor_placement_programme [12 Nov 2021 18:52]
andrew [CSCC Anchor Placement Programme] Added Rhino RHR
Line 4: Line 4:
  
 The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time. The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
-^Date  ^Cave^Description^Outcome^+^Date  ^Cave^Description^Status^
 |April 2020  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed| |April 2020  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 +|June 2020  |Rhino  |[[equipment:Rhino]], Right Hand Route, replace spits|Approved,  installed|
 |October 2020  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Meeting on 19th November '21| |October 2020  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Meeting on 19th November '21|
 ==== Documentation ==== ==== Documentation ====
  • Last modified: 14 May 2022 07:27
  • by andrew