Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
equipment:cscc_anchor_placement_programme [12 Nov 2021 17:46]
andrew [CSCC Anchor Placement Programme] Added Eastwater, 35ft pitch proposal
equipment:cscc_anchor_placement_programme [12 Nov 2021 17:46]
andrew [CSCC Anchor Placement Programme]
Line 4: Line 4:
  
 The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time. The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
-^Date  ^Cave^Description^Outcome^+^Date  ^Cave^Description^Status^
 |April 2020  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed| |April 2020  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 |October 2020  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Meeting on 19th November '21| |October 2020  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Meeting on 19th November '21|
  • Last modified: 14 May 2022 07:27
  • by andrew