Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
equipment:start [06 Nov 2010 14:34] faye Updated documents |
equipment:start [04 Oct 2023 18:11] cookie [Rhino Rift] Update to 2022 rigging topo |
||
---|---|---|---|
Line 21: | Line 21: | ||
If you come across a defective anchor please use the {{: | If you come across a defective anchor please use the {{: | ||
- | If you have a location that you believe needs anchors please use the {{: | + | If you have a location that you believe needs anchors please use the {{: |
If you are a CSCC Nominated Installer please complete the {{: | If you are a CSCC Nominated Installer please complete the {{: | ||
Line 41: | Line 41: | ||
EP = Entrance Pitch | EP = Entrance Pitch | ||
- | NB First 2 bolts have been cut off therefore making it unsafe to test the rest of the bolts, therefore the CSCC has agreed to let the remaining bolts lapse. | ||
==== Charterhouse Cave ==== | ==== Charterhouse Cave ==== | ||
Line 149: | Line 148: | ||
FP = First Pitch SP = Second Pitch TP = Third Pitch | FP = First Pitch SP = Second Pitch TP = Third Pitch | ||
- | The rigging below is now not correct for the first pitch: The Y-hang is made of tape (to be replaced with chain) to pass below the buldge of rock below that is not stable. The remaining cave rigging is the same. | + | {{: |
- | + | ||
- | {{: | + | |
==== Rod's Pot ==== | ==== Rod's Pot ==== |