 +====== CSCC Anchor Placement Programme ======
 +\\
 +To request that CSCC consider placing anchors in a place where there are currently none, or that may benefit for additional anchors, please bring it to a CSCC meeting by filling in the anchor request form below.
 +
 +The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
 +^Date  ^Cave^Description^Status^
 +
 +|April 2022  |White Pit  |[[equipment:White Pit]], Replace existing anchors|Approved 13th May 2022|
 +|October 2021  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Awaiting install|
 +|June 2021  |Rhino  |[[equipment:Rhino]], Right Hand Route, replace spits|Approved,  installed|
 +|April 2021  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 +==== Documentation ====
 +
 These documents describe the CSCC's Anchor Placement Programme. These documents describe the CSCC's Anchor Placement Programme.
  
Line 5: Line 18:
 {{:equipment:cscc-eq-pr-1001_rev_2_anchor_management_procedure.pdf|Anchor Management Procedure}} {{:equipment:cscc-eq-pr-1001_rev_2_anchor_management_procedure.pdf|Anchor Management Procedure}}
  
-{{:equipment:cscc-eq-gn-1002_rev_2_anchor_inspection_usage.pdf|Anchor Inspection & Usage}}[root@server equipment]#+{{:equipment:cscc-eq-gn-1002_rev_2_anchor_inspection_usage.pdf|Anchor Inspection & Usage}}