Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
equipment:cscc_anchor_placement_programme [04 Nov 2012 16:22]
cookie old revision restored
equipment:cscc_anchor_placement_programme [14 May 2022 07:27] (current)
andrew [CSCC Anchor Placement Programme] changed White Pit to approved
Line 1: Line 1:
 ====== CSCC Anchor Placement Programme ====== ====== CSCC Anchor Placement Programme ======
 \\ \\
 +To request that CSCC consider placing anchors in a place where there are currently none, or that may benefit for additional anchors, please bring it to a CSCC meeting by filling in the anchor request form below.
  
 +The list below details previous request and other intended work. A rejection in the past does not mean that the same place should not be submitted again, attitudes change over time.
 +^Date  ^Cave^Description^Status^
 +
 +|April 2022  |White Pit  |[[equipment:White Pit]], Replace existing anchors|Approved 13th May 2022|
 +|October 2021  |Eastwater  |[[equipment:35ft Pitch]], Replace anchors for ladder and line consider SRT|Awaiting install|
 +|June 2021  |Rhino  |[[equipment:Rhino]], Right Hand Route, replace spits|Approved,  installed|
 +|April 2021  |Swildons  |[[equipment:Approach Passage]], traverse and pitch|Approved,  installed|
 ==== Documentation ==== ==== Documentation ====
  
  • Last modified: 04 Nov 2012 16:22
  • by cookie