Differences

This shows you the differences between the selected revision and the current version of the page.

equipment:approved_placements 01 Feb 2010 17:14 equipment:approved_placements 01 Feb 2010 17:14 current
Line 3: Line 3:
The table below lists on going work and the current state, the dates refer to the CSCC meeting that the work was approved, for more information please see the relevant minutes. The table below lists on going work and the current state, the dates refer to the CSCC meeting that the work was approved, for more information please see the relevant minutes.
-|Date|Location|**Current Status**|+|**Date**|**Location**|**Current Status**|
|pre 2009|Thrupe Lane Swallet: High Atlas|On hold: On inspection, the current rigging was found to be adequate (Jan 2009)| |pre 2009|Thrupe Lane Swallet: High Atlas|On hold: On inspection, the current rigging was found to be adequate (Jan 2009)|
|May 2009|Wigmore Swallet: Black Pudding Pot|On hold: No trained placers, see other places for info| |May 2009|Wigmore Swallet: Black Pudding Pot|On hold: No trained placers, see other places for info|
|Dec 2009|Axbridge Ochre Mine|On hold: No trained placers, see other places for info| |Dec 2009|Axbridge Ochre Mine|On hold: No trained placers, see other places for info|