Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
equipment:approved_placements [01 Feb 2010 17:14]
andrew Added instructions, Wigemore Swallet, Axbridge Ochre Mine
equipment:approved_placements [01 Feb 2010 17:14]
andrew
Line 3: Line 3:
 The table below lists on going work and the current state, the dates refer to the CSCC meeting that the work was approved, for more information please see the relevant minutes. The table below lists on going work and the current state, the dates refer to the CSCC meeting that the work was approved, for more information please see the relevant minutes.
  
-|Date|Location|**Current Status**|+|**Date**|**Location**|**Current Status**|
 |pre 2009|Thrupe Lane Swallet: High Atlas|On hold: On inspection, the current rigging was found to be adequate (Jan 2009)| |pre 2009|Thrupe Lane Swallet: High Atlas|On hold: On inspection, the current rigging was found to be adequate (Jan 2009)|
 |May 2009|Wigmore Swallet: Black Pudding Pot|On hold: No trained placers, see other places for info| |May 2009|Wigmore Swallet: Black Pudding Pot|On hold: No trained placers, see other places for info|
 |Dec 2009|Axbridge Ochre Mine|On hold: No trained placers, see other places for info| |Dec 2009|Axbridge Ochre Mine|On hold: No trained placers, see other places for info|
  • Last modified: 01 Feb 2010 17:14
  • by andrew