Equipment

All anchors should be checked before use. See Anchor Inspection & Usage

Anchors that do not meet the tests should be reported to the Equipment Officer via email. Please see previous reports and the outcomes.

Anchors in the CSCC region that are not listed below have not been placed by the CSCC.

To be part of the scheme the placement of anchors must be approved by the CSCC. CSCC makes available past proposals that have been declined. Inclusion in this list does not exclude them as being proposed again in the future.

The placement of anchors is on going. For more information see the list of approved placements.


If you come across a defective anchor please use the Defective Anchor Form

If you have a location that you believe needs anchors please use the New Anchor Request Form

If you are a CSCC Nominated Installer please complete the Anchor Installation Sheet for any anchors you install.


Anchor Number
BH-EP-01Cut Off
BH-EP-02Cut Off
BH-EP-03
BH-EP-04
BH-EP-05
BH-EP-06

EP = Entrance Pitch

Anchor Number
CH-DP-01
CH-DP-02
CH-DP-03

DP = Dragon Pitch

Anchor Number
GB-LD-01
GB-LD-02
GB-LD-03
GB-LD-04

LD = Ladder Dig

Anchor Number
GC-LH-01
GC-LH-02
GC-LH-03
GC-LH-04
GC-LH-05
GC-LH-06
GC-LH-07
GC-OX-01
GC-OX-02
GC-OX-03

LH = Lloyd Hall OX = Oxbow

Anchor Number
HH-EP-01
HH-EP-02
HH-MH-01
HH-MH-02
HH-MH-03
HH-MH-04
HH-MH-05
HH-MH-06
HH-MH-07
HH-FR-01
HH-FR-02
HH-FR-03
HH-FR-04
HH-FR-05
HH-FR-06
HH-FR-07
HH-FR-08
HH-FR-09
HH-SP-01
HH-SP-02
HH-SP-03

EP = Entrance Pitch MH = Main Hang FR = Far right SP = Sago Pot

Entrance Pitch, Direct Traverse (Right-Hand Route), Sago Pot
Topo courteousy of Chris Binding
Hunter's Hole

Anchor Number
LO-SP-01

SP = Swing Pitch

Anchor Number
MF-SR-01
MF-SR-02
MF-SR-03
MF-SR-04

SR = September Rift

Anchor Number
RR-FP-01
RR-FP-02
RR-FP-03
RR-FP-04
RR-FP-05Removed
RR-FP-06Removed
RR-FP-07
RR-FP-08Reported defective, under investigation
RR-SP-01Reported defective, under investigation
RR-SP-02
RR-SP-03
RR-SP-04
RR-SP-05
RR-SP-06
RR-TP-01
RR-TP-02
RR-TP-03

FP = First Pitch SP = Second Pitch TP = Third Pitch

Rhino Rift Rigging Topo

Anchor Number
RP-PP-01
RP-PP-02
RP-PP-03
RP-PP-04
Anchor Number
SS-EP-02
SS-EP-03
SS-SP-01
SS-SP-02
SS-SP-03

EP = Entrance Pitch SP = Second Pitch

NB First 2 bolts are set in the concrete entrance cover. The bolts are therefore not covered by the BCA scheme. However, on the advice of the BCA Equipment and Techniques Committee, the CSCC has proof tested them with a load of 10KN instead of the usual 6KN.

Entrance Rigging (NB The bolts in the concrete are for rigger protection, not the main hang)
Topos courteousy of Chris Binding.
Star Shaft Entrance

Entrance Pitch
Star Shaft Entrance Pitch

Second Pitch
Star Shaft Second Pitch

Anchor Number
SH-TW-01
SH-TW-02
SH-TW-03
SH-CA-01
SH-CA-02
SH-CA-03
SH-CA-04
SH-CA-05
SH-CA-06
SH-CA-07
SH-CA-08
SH-CA-09
SH-CA-10
SH-CA-11
SH-CA-12
SH-CA-13
SH-CA-14
SH-SP-01
SH-SP-02
SH-SP-03
SH-SP-04
SH-BP-01

TW = Twenty CA = Cowsh Avens SP = Swine Puke BP = Blue Pencil

Anchor Number
WW-FP-01
WW-FP-02
WW-FP-03
WW-FP-04

FP = First Pitch

Anchor Number
TL-EP-01
TL-EP-02
TL-EP-03
TL-EP-04
TL-EP-05
TL-HA-01
TL-HA-02
TL-HA-03
TL-HA-04
TL-HA-05
TL-HA-06
TL-HA-07
TL-PP-01
TL-PP-02
TL-LP-01
TL-LP-02
TL-LP-03
TL-LP-04
TL-LA-01
TL-LA-02
TL-LA-03
TL-MS-01
TL-MS-02
TL-SP-01
TL-SP-02
TL-SP-03

Perseverence Pitch, Slither Pot, Streamway / Ledge Pitch
Topo courteousy of Chris Binding
Thrupe Lane Swallet

  • Last modified: 04 Oct 2023 18:11
  • by cookie